Phase 1 · Overview
Command Dashboard
Phase 1 KPIs · auto-refresh 30s
Active FLRT
12 / 18
67% deployed
Tankers Deployed
28 / 42
6 standby · 8 depot
Open Ingress Alerts
5
2 powered-asset impact
Standby Roster
34
2 gaps in Sector B
Live Operations Overview
IngressFLRTTankerCommander
Recent Activity
- ING-041 Water ingress · PS-12 CRITICAL 2 min
- TK-205 Status → Discharging TANKER 4 min
- FLRT-3 On-site · Al Quoz FLRT 7 min
- TK-207 Mechanical failure — Logistics notified ALERT 12 min
- PS-09 Fuel level 22% — spike alert FUEL 18 min
- HND-118 Shift handover submitted by SM-Deira OK 32 min
Field Operations
Live Operations Map
FLRT · E&M · Station Site Commanders — real-time GPS
All
FLRT
E&M
Site Commander
Personnel on Map
FLRT On-SiteFLRT En-RouteE&MSite Commander
Personnel List
| ID | Role | Location | Status |
|---|
Workforce
Personnel Directory
Competency & certification matrix
Workforce
Shift Handover
Digital handover · production & operations
New Handover — Shift ending 20:00
Recent Handovers
- HND-118 · SM-Deira → Night · 12:00 → 20:00
2 incidents open · PS-12 restored - HND-117 · SM-Bur Dubai → SM-Deira · 04:00 → 12:00
All-clear · roster full - HND-116 · Night → SM-Bur Dubai · 20:00 → 04:00
1 fuel spike PS-09 · under watch - HND-115 · SM-Deira → Night · Previous day
Tanker Ops
Tanker Live Map
Real-time GPS · status-coloured
Fleet Positions
AllEn-RouteDischargingStandbyFailure
FailureEn-RouteDewateringDischargingStandbyDemobilised
Tanker Ops
Tanker Fleet Board
42 tankers · status changes auto-notify OCC & Logistics
Standby
6
Dewatering
9
En-Route
11
Discharging
8
Mechanical Failure
2
Logistics notified
Demobilised
6
Relocation Requests
3
1 pending approval
Cycles Today
128
▲ 22 vs yday
Tanker Ops
Daily Production Report
Auto-generated · 13 Jul 2026
Cycles Completed
128
Target: 110
Trips Performed
342
▲ 8%
Water Pumped (m³)
4,120
peak 09:00–11:00
Fleet Utilisation
78%
2 units down
Per-Tanker Breakdown
| Tanker | Cycles | Trips | m³ | Uptime |
|---|---|---|---|---|
| TK-201 | 9 | 24 | 288 | 94% |
| TK-202 | 8 | 22 | 264 | 91% |
| TK-205 | 11 | 28 | 336 | 98% |
| TK-207 | 3 | 7 | 84 | Failure |
| TK-208 | 6 | 18 | 216 | 88% |
| TK-210 | 10 | 26 | 312 | 96% |
Equipment & Status Log
- TK-207 · Pump seal failure at 12:14 · Failure
- TK-214 · Demobilised for scheduled service · Demob
- TK-201 · Filter replaced 06:00 · OK
- TK-210 · Refuel at 14:30 · OK
- TK-205 · Relocated Karama → Al Quoz (OCC request) · Relocated
Stations
Station Ingress Alerts
Water detected · powered-asset & service-impact flags
Affected Stations
Service ImpactPowered-Asset ImpactIngress DetectedNormal
Stations
Pump Relocation
Move pump assets between stations · OCC approval required
New Request
Stations
Fuel Monitoring
Critical equipment · consumption spike/drop alerts
Assets Below 30%
4
Refuel scheduled: 2
Spike Alerts (24h)
2
PS-09, TK-207
Avg Consumption
14.2 L/h
Within band
Workforce
Competency Tracker
Expiries · gaps · renewal calendar
Certifications Active
142
Expiring in 60d
11
2 site commanders
Expired
3
Blocking deployment
Renewals This Month
| Person | Cert | Expires | Status |
|---|---|---|---|
| L. Ahmed | TA/SM Train Driving | 2025-12-15 | Expired |
| S. Fernandes | FLRT Qualification | 2026-02-10 | Renew Soon |
| D. Costa | Coupling Ops | 2026-02-22 | Renew Soon |
| P. Nair | MU Technician L2 | 2026-03-04 | Renew Soon |
Coverage Gaps by Zone
Sector A · DeiraFullOK
Sector B · Bur Dubai2 shortGap
Sector C · Al QuozFullOK
Sector D · Jumeirah1 shortWatch
Sector E · SZRFullOK
Workforce
Site Commander Roadmap
Commander logins & auto shift-report generation
Active Commander Logins
Logged InLateOff-Duty
Auto-Generated Shift Reports
- SR-2041 · SM-Deira · Day shift
2 incidents · 4 handovers · PDF ready - SR-2040 · SM-Bur Dubai · Day shift
0 incidents · roster full - SR-2039 · SM-Al Quoz · Night shift
1 fuel spike · PDF ready - SR-2038 · SM-Karama · Night shift
Workforce
Roster Alignment
Gaps · conflicts · notifications
Scheduled
86
On-Duty
72
Gaps
3
Sector B
Conflicts
1
Double-booked
Workforce
Work Assignment (from ECC)
Assign staff to stations
New Assignment
Integration
OCC Synchronisation
Network overhaul status & weak points
Network Availability
96.8%
2 sections degraded
Overhaul in Progress
3
On schedule
Weak Points Flagged
7
2 critical
Weak-Point Heatmap (network sectors)
Low
High
Active Overhauls
| Section | Type | Start | ETA | Status |
|---|---|---|---|---|
| SEC-04 Deira | Track | 10 Jul | 18 Jul | On Track |
| SEC-11 SZR | Drainage | 08 Jul | 15 Jul | Delayed 2d |
| SEC-17 Karama | Signalling | 12 Jul | 20 Jul | On Track |